We match your energy needs to renewable generators near you. All switching is handled by our Ofgem regulated supply partner.
Ground rents
Ground rent investors in the UK are facing significant challenges due to recent regulatory changes. The government has implemented reforms to protect leaseholders, including capping ground rents on new leases to zero, this drastically reduces the income stream for ground rent investors. Additionally, there is growing pressure to reform existing leases, which could further erode returns.
As a result, the once profitable ground rent market is now much less attractive, leaving many investors with devalued assets and limited prospects for future earnings. Many are having their funding lines pulled or reduced.
This led us to the following question:
How can you create long term sustainable value for Freeholders?
Energising the future
We have already secured over 1000 residential roof leases across the UK, with many more in the pipeline.
8-12 week installation from lease being signed to cashflow generation, including grid applications, lease and power agreement for power and installation of the PV.
Installation of micro-PV farms to generate solar energy, working in partnership with key manufacturers and national installers.
Begin to aggregate the micro-PV farms to provide a portfolio which equates to that of a large-scale PV farm without the planning and regulatory constraints.
Swap your energy provider via SoWatt to provide residents cheaper 100% renewable energy whilst making a saving.
Potential bolt on revenue streams, including battery and EV charging.
What next?
1st Day
We confirm agreement on the 5 key heads of terms in principle
If these do not work, we do not proceed.
You provide:
• Site location
• Latest electricity bill
Within 24 hours
We issue a short written synopsis covering:
• System suitability
• Indicative system size
• Indicative tariff and savings
If the saving works for you, then we proceed to next stage:
In up to 5 days, we issue
• Heads of terms
• Short Letter of Intent
You confirm
• Exclusivity
• Access for survey
• Intention to proceed to full contracts
Our team contacts you to arrange access and site survey.
Within 5 days
We carry out the site survey and confirm final design assumptions.
1st Day
Roof lease and PPA signed.
Programme for installation confirmed.
3 to 4 weeks
We manage all technical approvals, procurement and installation.
We liaise with you to agree exact dates and timings to ensure a smooth installation with minimal disruption.
Ongoing
System goes live.
You start saving immediately.
Our team manages monitoring, maintenance and billing and remains available for ongoing support.
• No upfront cost
• Clear decision points
• Fast progression or fast stop
• One point of contact throughout
Freeholders